Frequently Asked Questions

1. How we will get the PM Surya Ghar yojna subsidy?

R: You need to contact an empanelled vendor for the PM Surya Ghar Yojna who will provide you with complete information about this scheme.

2. How much rooftop space required for installation?

R: It depends on the size of your solar system. For a 1 kW system, the space required is 70 square feet.

3. What are the components for which an extra bill will be added to the base price?

R: There is no extra charge except for the material delivery to your location.

4. How much electricity bill we can save monthly?

R: The amount of energy generated depends on your load consumption and the system you are installing. A 1 kW system can produce approximately 100-120 Units of energy per month. By comparing this with your monthly electricity bill, you can estimate your potential monthly savings

5. What would be the maintenance cost associated with it?

R: We will give you free maintenance for up to 5 years. Cover cleaning, and not cover physical damage.

6. After installation, how many days will I get the subsidy amount?

R: After the installation, the net meter will be set up within 15 days. Subsequently, you will receive the subsidy within the following 30 days.

7. Where will I get the subsidy amount?

R: You will get the subsidy in your bank accounts which you have filled while doing registration.

8. What kind of appliances can I use for solar power?

R: You can use all your appliances without worry, as the grid connection will supply any additional demand.

9. How do I decide what size of system I need?

R: We recommend opting for a larger system to minimize your monthly bill. It's important to consider your monthly consumption as well. Our team is here to help you determine the best system for your home.

10. What would be the cost of a net meter, and in how many days will it get installed?

R: The net meter is configured through the electricity office. If you already have a smart meter installed in your home, this service will be free of charge. It may take 15 days after the system is installed.